Aluminum Coil Industrial Cold Room Doors - Prefabricated High Strength Stable Steel Flooring Formwork for Commercial Building Construction – FAMOUS
Aluminum Coil Industrial Cold Room Doors - Prefabricated High Strength Stable Steel Flooring Formwork for Commercial Building Construction – FAMOUS Detail:
Prefabricated High Strength Stable Steel Flooring Formwork for Commercial Building Construction
The steel flooring formwork is a new composite steel floor decking design and it is widely applied for the mezzanine construction of commercial and civilian buildings, such as factories, hospitals, gymnasiums, schools, bridge projects and residential buildings. The steel flooring formwork is composed of two parts, the steel bar truss deck melted onto the galvanized steel sheet.
The steel flooring formwork is made of galvanized steel sheet and steel bar truss. The metal floor deck can bear the construction load and be directly put on girders. After the simple rebar-tying work, the workers can directly pour concrete into the truss deck. The application of the steel bar truss deck greatly reduces the workload of mould putting and tear down. In a word, it can help increase the work efficiency and advance the project period.
Specifications:
Name |
Steel flooring formwork |
Base Material |
Hot Dipped Galvanized Steel Sheet |
Steel Grade |
SGCC |
Yield strength |
Q235 or Q345 Refer to Standards GB/T1591-2008 |
Thickness |
0.8mm,1.0mm,1.2mm |
Zinc coating |
60-275g/m2 |
Wave Height |
51mm-76mm |
Effective Width |
688mm-940mm |
Length |
0-11.8m |
Less than 5.8m load in 20GP |
|
5.8m-11.8m load in 40GP |
|
Packing |
Bundle ,water-proof package with steel belt |
Delivery time |
20 days after confirmation |
Advantages:
1. Steel bars are evenly arranged and the bearing mode is reasonable, which greatly reduces the engineering quantity of temporary support.
2. The double edge fold design can effectively ensure the quality of the engineering.
3. It can shorten the time by reducing 60% to 70% work load of binding steel bars.
4. It has the same mechanical properties and fire resistance as that of traditional cast-in-place floors. Because the bottom mould does not join in the load-baring, it is unnecessary to consider fire proof and anti-corrosion.
Applications:
1. Applied to precast slabs, pr-high-speed railway sleeper.
2. Used in many high-rise, ultra- high-rise steel buildings
3. Used for steel building, mezzanine floor of “LOFT”
4. The force applied to the complex, special-shaped structure, building
5. Used in-situ concrete structure(RC) buildings
6. Used in the construction of slope roof structure
Details:
Production Process:
Packing & Shipping
Welcome to send your enquiry about more technical specifications together!
Product detail pictures:
Related Product Guide:
Now open: Seychelles eco camp comprised of recycled shipping containers • Hotel Designs | Glass Facade
Velocity Restorations Ford Bronco SEMA restomod driving review | Quick Lifting Doors
With our abundant experience and considerate products and services, we have been recognized to be a reputable supplier for a lot of global consumers for Aluminum Coil Industrial Cold Room Doors - Prefabricated High Strength Stable Steel Flooring Formwork for Commercial Building Construction – FAMOUS , The product will supply to all over the world, such as: Japan, Latvia, Iran, We attained ISO9001 which provides solid foundation for our further development. Persisting in "High quality, Prompt Delivery, Competitive Price", we have established long-term cooperation with clients from both overseas and domestically and get new and old clients' high comments. It is our great honor to meet your demands. We are sincerely expecting your attention.
By Ina from United States - 2018.09.12 17:18
Goods just received, we are very satisfied, a very good supplier, hope to make persistent efforts to do better.
By Aaron from Karachi - 2018.02.08 16:45