Heated Self-Stripping Steel Deck Forms for Cold-Weather Concreting to EN 1993, AASHTO LRFD & AS
Steel bridge deck formwork refers to a steel bottom formwork system that replaces traditional wooden forms or full scaffolding when pouring concrete bridge decks. Its core concept is to use the stiffness of the steel plate itself and the stiffening ribs to directly transfer the weight of the wet concrete to the steel main beams, enabling work under the bridge without support. The products are divided into three main types: non-removable corrugated plates (permanent, also serving as reinforcement), quick-release flat formwork (reusable 30–50 times), and telescopic formwork (adjustable width, reusable for different beam spacings).

1.Scenario Category
Scenario Category |
Typical Application Environment |
Recommended Form Configuration |
Cast-in-place Bridge Deck |
Highway/railway cast-in-place bridge decks, urban overpass deck pouring |
Integral large-panel steel formwork, fast-dismantling formwork |
Prefabricated Panel Factory |
Factory batch prefabrication of bridge deck panels, precast concrete components |
Modular combined steel formwork, standardized fixed formwork |
Bridge Reconstruction & Widening |
Old bridge deck repair, bridge widening, local deck replacement |
Custom-sized matching formwork, lightweight assembled formwork |
Special-shaped Deck Structure |
Curved ramp bridges, skew bridges, variable-width deck, landscape special-shaped bridges |
Custom-shaped special steel formwork, flexible adjustable formwork |
2.Product Highlights
l Magnetic Base Fixing System: The formwork is attached to the steel beam flange via a permanent magnetic suction cup, eliminating the need for welding or drilling, and increasing installation speed by 3 times.
l Wedge Self-Locking Joints: The long sides of adjacent formworks use angled wedges for locking, requiring no bolts, and lock themselves under the side pressure of the concrete to prevent slurry leakage.
l Formwork Bottom Film Release Layer: The contact surface of the quick-release formwork is coated with a 0.5mm thick PTFE film. After the concrete cures, the formwork detaches automatically without the need for hammering.
l Adjustable Telescopic Frame: The formwork width can be adjusted continuously within the range of 1.5–2.5m, allowing one set of formworks to fit different main beam spacings.
l Ear Plate Quick-Release Lifting Points: Folding lifting ears are set at the four corners of the formwork. When removing the formwork, it can be lifted by rotating 90° with a crowbar, eliminating the need to climb under the bridge.
l Formwork Stack Positioning Pins: Conical positioning pins are installed at the four corners of the formwork, automatically aligning the formworks when stacking, saving storage space and preventing slippage.

3.Product Materials
The core materials of our steel bridge deck forms are all high-quality steel and auxiliary materials that strictly meet the global industrial formwork standards, and the material system is precisely matched according to the load requirements, service environment and reuse times of the formwork. The core material system is as follows:
ü High-quality low-carbon structural steel plate: Adopting Q235B, Q355B and ASTM A36 grade high-quality hot-rolled steel plates, with excellent tensile strength, yield strength, bending performance and welding performance, it is the core base material of the formwork panel and frame, ensuring the overall rigidity and structural stability of the formwork, and can withstand the lateral pressure of concrete pouring without deformation.
ü High-precision cold-formed steel section: Adopting high-precision cold-formed rectangular tube, square tube and channel steel, with uniform wall thickness, high dimensional accuracy and excellent bending resistance, it is used for the back ridge, support frame and connecting keel of the formwork, which effectively improves the overall stiffness and load-bearing capacity of the formwork, and reduces the self-weight of the formwork at the same time.
ü High-performance surface anti-corrosion and anti-adhesion coating: The surface of the formwork panel is treated with hot-dip galvanizing, epoxy zinc-rich primer or fluorocarbon anti-adhesion coating, which has excellent anti-corrosion performance and concrete anti-adhesion performance, can effectively prevent the formwork from rusting in the humid construction environment, and ensure that the concrete surface is smooth and free of pockmarks after demoulding, reducing the later surface repair work.
ü High-strength wear-resistant connecting accessories: All connecting parts of the formwork adopt 8.8/10.9 grade high-strength bolts, quick-lock clamps and positioning pins that meet ASTM and EN standards, with ultra-high shear strength and wear resistance, which can ensure the firm connection and accurate positioning of the formwork units, and can withstand the vibration and impact during concrete pouring without loosening and deformation.
ü Stainless steel panel for special requirements: For projects with high requirements on concrete surface quality and anti-corrosion performance, we can provide 304/316 stainless steel panel formwork, which has excellent smoothness, anti-corrosion performance and anti-adhesion performance, can realize the mirror effect of the concrete surface after demoulding, and is especially suitable for the construction of landscape bridge decks and high-speed railway bridge decks with high surface quality requirements.

4.Design Features
Ø Construction Stage Load Combination: Verify formwork strength according to 1.5 kN/m² self-weight of wet concrete and 2.0 kN pump pipe thrust due to construction live load.
Ø Consider Concrete Pouring Sequence: Calculate lateral pressure on the formwork based on the layer height (first layer ≤0.5 m) and pouring speed (≤2 m/h).
Ø Corrugated Sheet Longitudinal and Transverse Overlap: Long edges overlapped ≥25 mm, short edges provided with tongue and groove; overlaps temporarily fixed with screws or nails.
Ø Quick-Release Formwork Stripping Timing: Forms can be removed when concrete compressive strength ≥5 MPa (usually 6–12 hours after pouring, depending on air temperature).
Ø Expansion Frame Stiffness Compensation: Increase auxiliary supports when widening, to prevent mid-span deflection exceeding L/200.
Ø Formwork Layout Numbering System: Each formwork panel is numbered according to the bridge deck section drawing (e.g., A-1, B-3) and laid out on site according to the numbers, with zero setting out.

5.Core Advantages
⭐Zero Scaffolding Construction: Formwork is directly placed on the steel main beam flange; no vertical supports are needed below the bridge, causing zero traffic interference underneath.
⭐No Welding or Drilling Required: Magnetic base with wedge locking causes no damage to the steel beam parent material, and no hot work is needed on site.
⭐High Reusability: Quick-release PTFE-coated formwork can be reused 50 times, with single-use cost only 1/5–1/8 of wooden formwork.
⭐Extremely Lightweight: Non-removable corrugated sheets 6–10 kg/m², quick-release flat panels 30–40 kg/m², manually handled by workers.
⭐Fast Installation Speed: Skilled crews can lay 300–500 m² of formwork per day (including magnetic fixing and joint sealing).
⭐Concrete Bottom Surface Requires No Plastering: Steel formwork surface flatness ≤2 mm/2 m; after removal, concrete bottom can be directly finished with coatings.

6.Global Standard
Standard Name |
Issuing Authority |
Core Application Scope |
AASHTO LRFD Bridge Construction Specifications |
American Association of State Highway and Transportation Officials |
North American bridge construction formwork design, safety and performance requirements |
ASTM A36/A36M-24 Standard Specification for Carbon Structural Steel |
American Society for Testing and Materials (ASTM) |
Global steel formwork base material performance and quality requirements |
BS EN 1993-1-1:2005 Design of Steel Structures - Part 1-1 |
British Standards Institution (BSI) |
UK and EU steel formwork structural design, load calculation and safety requirements |
GB 50214-2019 Code for Construction of Steel Structures |
Standardization Administration of China |
Chinese domestic steel formwork construction, acceptance and quality control |
ISO 12000-2:2020 Building construction machinery and equipment - Formwork - Part 2 |
International Organization for Standardization (ISO) |
Global steel formwork performance, safety and interchangeability requirements |
7.Choose Us
Choosing our steel bridge deck formwork means you are opting for a paradigm shift that transforms bridge deck casting from 'building scaffolds and waiting for curing' to 'laying the formwork and pouring concrete immediately.' We do not just deliver steel plates—we provide magnetic fixing points verified for construction loads, wedge-lock joints validated against slurry leakage, and a flatness guarantee that allows the bottom surface of the concrete to be delivered without plastering.
📧Satisfied after reading? Feel free to contact us, we look forward to working with you!🤝