Magnetic-Fixed Deck Forms For Bridge per EN 1993, AWS D1.5 & AS 5100
Steel bridge deck formwork refers to a steel bottom formwork system used to replace traditional wooden forms or full scaffolding when pouring concrete bridge decks. Its core principle is to use the stiffness of the steel plate and its stiffening ribs to directly transfer the weight of the wet concrete to the steel main beams, allowing work to be carried out without support under the bridge. The products are divided into three main types: non-removable corrugated plates (permanent and can double as reinforcement), quick-release flat forms (reusable 30–50 times), and telescopic formwork (adjustable in width to repeatedly fit different beam spacings).

1.Application Scenario
Application Scenario |
Core Application |
New Steel Bridge Deck Cast-in-place Construction |
Highway steel bridges, urban steel viaducts, high-speed railway & freight railway steel bridge decks |
Existing Steel Bridge Deck Rehabilitation & Repair |
Aging steel bridge deck re-pouring, local structural damage repair, load capacity strengthening |
Special-shaped Steel Bridge Deck Custom Construction |
Curved steel bridges, skew steel decks, special-shaped landscape steel bridges, super-elevated bridge decks |
Temporary & Emergency Steel Bridge Construction |
Disaster emergency repair steel bridges, temporary construction access steel bridges, short-term temporary traffic steel bridges |
2.Product Highlights
l Magnetic Base Fixing System: The formwork is attached to the steel beam flange via a permanent magnet suction cup, without welding or drilling, increasing installation speed by 3 times.
l Wedge Self-Locking Joints: The long sides of adjacent formworks use slanted wedge locks, no bolts are required, and they lock themselves under the lateral pressure of the concrete, preventing grout leakage.
l Formwork Bottom Film Release Layer: A 0.5mm thick PTFE film is applied to the contact surface of the quick-release formwork. After concrete curing, the formwork separates by itself without hammering.
l Adjustable Telescopic Frame: The formwork width can be adjusted steplessly between 1.5–2.5m, allowing one set of formwork to fit different main beam spacings.
l Ear Plate Quick-Release Lifting Points: Foldable lifting ears are installed at the four corners of the formwork. During removal, lifting can be done by rotating with a crowbar 90° without climbing under the beam.
l Formwork Stacking Positioning Pins: Cone-shaped positioning pins are installed at the four corners, automatically aligning when stacked, saving storage space and preventing slipping.

3.Product Materials
ü Non-Removable Corrugated Plate
Galvanized steel plate DX51D Z (EU standard) / ASTM A653 G90 (US standard) / AS 1397 G550 (Australian standard), thickness 0.75–1.5mm, corrugation depth 35–55mm.
ü Quick-Release Flat Panel Formwork
Ordinary carbon structural steel Q235B (EU standard S235JR / US standard A36 / Australian standard AS 3678 Grade 250), thickness 4–6mm, bottom frame welded from rectangular tube.
ü Telescopic Frame
Aluminum alloy 6061-T6 or galvanized steel, embedded with sliding rails and locking handles, suitable for beam spacing of 1.5–4.0m.
ü Permanent Magnet Suction Base
Neodymium iron boron (NdFeB) magnetic material, single-point suction ≥500kg, wrapped in stainless steel shell, operating temperature -40°C to 80°C.
ü Release Layer (Quick-Release Type Only)
Polytetrafluoroethylene (PTFE) film, thickness 0.5mm, thermally pressed on the top surface of the formwork, service life ≥30 turnovers.
ü Sealing Grout Stop Strip
EPDM (ethylene propylene diene monomer) foam strip, applied to formwork overlaps, no leakage at 30% compression.

4.Design Features
Ø Construction Stage Load Combination: Verify formwork strength according to 1.5 kN/m² self-weight of wet concrete and 2.0 kN pump pipe thrust due to construction live load.
Ø Consider Concrete Pouring Sequence: Calculate lateral pressure on the formwork based on the layer height (first layer ≤0.5 m) and pouring speed (≤2 m/h).
Ø Corrugated Sheet Longitudinal and Transverse Overlap: Long edges overlapped ≥25 mm, short edges provided with tongue and groove; overlaps temporarily fixed with screws or nails.
Ø Quick-Release Formwork Stripping Timing: Forms can be removed when concrete compressive strength ≥5 MPa (usually 6–12 hours after pouring, depending on air temperature).
Ø Expansion Frame Stiffness Compensation: Increase auxiliary supports when widening, to prevent mid-span deflection exceeding L/200.
Ø Formwork Layout Numbering System: Each formwork panel is numbered according to the bridge deck section drawing (e.g., A-1, B-3) and laid out on site according to the numbers, with zero setting out.

5.Core Advantages
⭐Zero Scaffolding Construction: Formwork is directly placed on the steel main beam flange; no vertical supports are needed below the bridge, causing zero traffic interference underneath.
⭐No Welding or Drilling Required: Magnetic base with wedge locking causes no damage to the steel beam parent material, and no hot work is needed on site.
⭐High Reusability: Quick-release PTFE-coated formwork can be reused 50 times, with single-use cost only 1/5–1/8 of wooden formwork.
⭐Extremely Lightweight: Non-removable corrugated sheets 6–10 kg/m², quick-release flat panels 30–40 kg/m², manually handled by workers.
⭐Fast Installation Speed: Skilled crews can lay 300–500 m² of formwork per day (including magnetic fixing and joint sealing).
⭐Concrete Bottom Surface Requires No Plastering: Steel formwork surface flatness ≤2 mm/2 m; after removal, concrete bottom can be directly finished with coatings.

6.Global Standard
Standard Code |
Standard Name |
Issuing Organization |
Applicable Scope |
AASHTO LRFD BDS 9th Edition / AWS D1.5M/D1.5:2020 |
LRFD Bridge Design Specifications / Bridge Welding Code |
American Association of State Highway and Transportation Officials (AASHTO) / American Welding Society |
US steel bridge design, welding & fabrication standards for steel formwork |
EN 1993-1-1:2005 / EN 1090-2:2018 |
Eurocode 3: Design of steel structures / Execution of steel structures |
European Committee for Standardization (CEN) |
EU steel structure design, fabrication & execution standards for steel formwork |
GB 50017-2017 / GB 50661-2011 |
Code for Design of Steel Structures / Code for Construction and Acceptance of Steel Structures |
National Standardization Administration of China |
Chinese steel structure design, construction & acceptance standards for bridge formwork |
ISO 9001:2015 |
Quality management systems - Requirements |
International Organization for Standardization |
Global quality management & production control for steel formwork products |
7.Choose Us
Choosing our steel bridge deck formwork means you are opting for a paradigm shift that transforms bridge deck casting from 'building scaffolds and waiting for curing' to 'laying the formwork and pouring concrete immediately.' We do not just deliver steel plates—we provide magnetic fixing points verified for construction loads, wedge-lock joints validated against slurry leakage, and a flatness guarantee that allows the bottom surface of the concrete to be delivered without plastering.
📧Satisfied after reading? Feel free to contact us, we look forward to working with you!🤝

ICF(Insulated Concrete Form) Bracing