Prefabricated High Strength Stable Steel Flooring Formwork for Commercial Building Construction

Short Description:

Prefabricated High Strength Stable Steel Flooring Formwork for Commercial Building Construction   The steel flooring formwork is a new composite steel floor decking design and it is widely applied for the mezzanine construction of commercial and civilian buildings, such as factories, hospitals, gymnasiums, schools, bridge projects and residential buildings. The steel flooring formwork is composed of two parts, the steel bar truss deck melted onto the galvanized steel sheet.   The st...


  • Port: Hangzhou
  • Payment Terms: L/C,D/A,D/P,T/T
  • Product Detail

    Product Tags

    Prefabricated High Strength Stable Steel Flooring Formwork for Commercial Building Construction

     

    The steel flooring formwork is a new composite steel floor decking design and it is widely applied for the mezzanine construction of commercial and civilian buildings, such as factories, hospitals, gymnasiums, schools, bridge projects and residential buildings. The steel flooring formwork is composed of two parts, the steel bar truss deck melted onto the galvanized steel sheet.

     

    The steel flooring formwork is made of galvanized steel sheet and steel bar truss.  The metal floor deck can bear the construction load and be directly put on girders. After the simple rebar-tying work, the workers can directly pour concrete into the truss deck. The application of the steel bar truss deck greatly reduces the workload of mould putting and tear down. In a word, it can help increase the work efficiency and advance the project period.

     

    Specifications:

    Name

    Steel flooring formwork

    Base Material

    Hot Dipped Galvanized Steel Sheet

    Steel Grade

    SGCC

    Yield strength

    Q235 or Q345 Refer to Standards GB/T1591-2008

    Thickness

    0.8mm,1.0mm,1.2mm

    Zinc coating

    60-275g/m2

    Wave Height

    51mm-76mm

    Effective Width

    688mm-940mm

    Length

    0-11.8m

    Less than 5.8m  load in 20GP

    5.8m-11.8m load in 40GP

    Packing

    Bundle ,water-proof package with steel belt

    Delivery time

    20 days after confirmation

     

    Advantages:

    1. Steel bars are evenly arranged and the bearing mode is reasonable, which greatly reduces the engineering quantity of temporary support.

    2. The double edge fold design can effectively ensure the quality of the engineering.

    3. It can shorten the time by reducing 60% to 70% work load of binding steel bars.

    4. It has the same mechanical properties and fire resistance as that of traditional cast-in-place floors. Because the bottom mould does not join in the load-baring, it is unnecessary to consider fire proof and anti-corrosion.

    Applications:

    1. Applied to precast slabs, pr-high-speed railway sleeper.

    2. Used in many high-rise, ultra- high-rise steel buildings

    3. Used for steel building, mezzanine floor of “LOFT”

    4. The force applied to the complex, special-shaped structure, building

    5. Used in-situ concrete structure(RC) buildings

    6. Used in the construction of slope roof structure

    Details:

     1

    Production Process:

     2

    Packing & Shipping

     3

    Welcome to send your enquiry about more technical specifications together!


  • Previous:
  • Next:

  • Write your message here and send it to us
    WhatsApp Online Chat !