Steel bridge deck formwork refers to a temporary or permanent steel base formwork system used for the construction of cast-in-place concrete bridge decks. Its core function is to provide a smooth and stable casting surface before the concrete hardens, and to bear the self-weight of wet concrete as well as construction live loads. The products include three main types: stay-in-place corrugated forms (Stay-in-place / SIP form), removable flat panel forms (Removable panel form), and permanent composite forms (Permanent composite form), suitable for different spans, construction schedules, and structural design requirements.

1.Application Scenario
Application Scenario |
Detailed Application Scope |
Highway Steel Bridge Deck |
Expressway viaducts, overpasses and grade separation bridges deck pouring |
Urban Municipal Bridge |
Urban road steel bridges, landscape bridges and pedestrian overpass deck construction |
Railway & Light Rail Bridge |
Railway steel girder bridges, urban light rail viaduct bridge deck casting |
Long-span Composite Bridge |
Steel-concrete composite beam bridge, truss bridge deck integral forming |
Rural & County Road Bridge |
Small and medium-span steel deck bridges for rural highway reconstruction projects |
Temporary Engineering Bridge |
Temporary steel structure passage bridge, emergency rescue bridge deck formwork support |
2.Product Highlights
l Zero scaffolding construction: The formwork is directly placed on the steel main beam or beam, and there is no need for any temporary support under the bridge, which does not interfere with the traffic or navigation below.
l Corrugated ribs are self-bearing: the corrugated cross-section significantly increases the out-of-plane stiffness of the formwork and allows for greater spacing between main beams (up to 3 meters).
l Synergistic stress with concrete: the indentation or rib on the surface of the non-dismantling formwork forms a mechanical bite with the concrete, and the formwork participates in the structural work as a permanent reinforcement.
l Quick-release and recycling: A set of quick-release formwork can be used 30~50 times, and the cost of dilution is extremely low in a single use.
l Web reserved pipe holes: prestressed pipe grooves or equipment lifting point openings can be preset on the edge of the formwork.
l Factory pre-assembly number: Each formwork is numbered according to the bridge deck block diagram, and the site is laid according to the number to eliminate stakeout errors.

3.Product materials
ü Non-disassembly corrugated bottom mold
The material is galvanized steel plate (DX51D Z / ASTM A653 G90), the thickness of the plate is 0.75~1.5mm, and the yield strength ≥ 280MPa. The surface is embossed or indented to enhance the bond to the concrete.
ü Quick-release flat formwork
Q235B or S235JR carbon structural steel, plate thickness 3.0~6.0mm, bottom frame and stiffener welded forming, surface spray release agent coating.
ü Permanently combine templates
The material is S355J2 N structural steel plate, the thickness of the plate is 4~8mm, and the lower surface is welded with shear nails or Z-shaped connectors to achieve a complete combination with concrete.
ü Connectors
The positioning connection between the formwork and the main beam adopts hook bolts (M16~M20) with rubber washers to prevent the formwork from floating during the pouring process.
ü Seal the slurry strip
The longitudinal and horizontal splicing joints of the formwork are pasted with water-expanding sealing strips or sponge rubber strips to prevent cement mortar leakage.
ü Coating system (quick-release type)
Epoxy primer Acrylic topcoat, total film thickness 120μm, convenient for release agent adhesion and template cleaning.

4.Design features
Ø Stress mechanism of bidirectional slab: bear the weight of wet concrete (typical value of 2.5m concrete load is about 60kN/m²) and construction live load (1.5kN/m² pouring and ramming load), and calculate the stress and deformation according to the theory of elastic sheet.
Ø Allowable deflection control: The deflection of the formwork in the middle of the span is controlled at L/200 or 5mm (whichever is less) to ensure the flatness of the bridge deck and the uniformity of concrete thickness.
Ø Edge lap structure: The long side of the adjacent formwork is stacked at least 25mm, and the short side is clamped with an opening or bolt to form a continuous strip.
Ø Temporary opening reinforcement: The pump pipe passes through the hole, the inlet hole of the vibrator rod and other temporary openings are set up with flanging or ring stiffeners.
Ø Electric heat tracing option: Paste the heat tracing on the back of the formwork during construction in cold areas, and maintain a constant temperature environment of more than 5 °C during the concrete curing period.
Ø Barrier-free leveling spacer: The elevation deviation of the top surface of the main beam can be accurately adjusted by the bolt foot spacer at the bottom of the formwork.

5.Core Advantages
⭐Zero Occupancy Under the Bridge: No need for ground supports or scaffolding, so traffic, rivers, and railways under the bridge are completely unaffected.
⭐Construction Period Reduced by 50%: Formwork installation and rebar tying can be done simultaneously, and concrete pouring can immediately follow formwork installation.
⭐Lightweight Formwork: Non-removable corrugated panels weigh only 6–12 kg per square meter, allowing workers to move and install them by hand without cranes.
⭐Reduction of Construction Waste: Non-removable formwork becomes part of the structure, producing no demolition waste; quick-release formwork is reusable, generating almost zero waste.
⭐Controllable Concrete Quality: Steel bottom formwork provides a smooth and level base, and after removal (for quick-release formwork), no secondary plastering is needed to meet appearance requirements.
⭐Structural Synergy Contribution: Permanent composite formwork can replace lower rebar, saving about 8–12 kg of rebar per square meter.
⭐Dual Function as Waterproof Barrier: Non-removable galvanized formwork acts as a second waterproof layer when cracks appear on the bridge deck, delaying chloride penetration.

6.Global Standard System
Global Standard System |
Compliance Specification Requirements |
ASTM International |
Comply with ASTM A36 steel material standard and bridge formwork load design standard |
European EN Standard |
Meet EN 10025 structural steel specification and EN 1991 bridge construction load standard |
ISO International Standard |
Follow ISO 9001 production quality management and ISO 14001 environmental manufacturing standard |
AASHTO Bridge Standard |
Conform to AASHTO highway bridge deck construction formwork technical code |
GB Chinese National Standard |
Comply with GB/T 700 carbon steel standard and JTG/T bridge construction formwork specification |
Australian AS Standard |
Meet AS 3678 structural steel and road bridge engineering formwork design requirements |
7.Why choose us
Choosing our steel bridge deck formwork means you are choosing a mature process solution that makes cast-in-place bridge deck construction faster, safer, and causes zero disturbance to the environment below the bridge. We not only provide steel plates—we provide a complete set of deliverables, from casting condition verification, joint seepage prevention structure, temporary hole reinforcement, to quick-release formwork turnover management solutions.