Leave Your Message
Products Categories
Featured Products

Steel Road Bridge Deck Panel to AWS D1.5 Welding Code and AS 5100

Product Positioning: This product is a high-strength precast concrete bridge deck panel specifically designed for highway bridges, suitable for new construction and rapid repair projects.

Core Advantages: Made with high-performance materials and modular design, it features high load-bearing capacity, easy installation, waterproof durability, and skid and wear resistance.

Applicable Scenarios: Widely applicable to highway bridges, urban interchanges, regular road bridges, and emergency repair projects for various highway deck applications.

Service Guarantee: Provides full-process professional service support, from design selection, production supply to on-site technical guidance and quality assurance.

    The Road Bridge Deck Panel is a prestressed concrete component specifically designed for highway bridge structures, constructed by factory prefabrication and on-site assembly. This product replaces the traditional on-site casting process, significantly shortening construction time, reducing on-site wet operations, while ensuring component dimensional accuracy and structural consistency. The panel is equipped with high-strength reinforcement or steel strands inside, providing excellent bending, shear, and fatigue resistance, making it suitable for the deck structural layer of various highway bridges.

     

    ddcb810f6ba9dad244b8db58071ca56c


    1.
    Application Scenarios

    Application Type

    Specific Scenarios

    Highway Bridges

    Expressway bridges, municipal main road bridges, ordinary river-crossing bridges

    Reconstruction Projects

    Old bridge renovation, bridge deck reinforcement, damaged panel replacement

    Auxiliary Facilities

    Pedestrian and vehicular dual-purpose bridges, rural small-span bridges, temporary traffic bridges

     

    2.Product Highlights

    Fast Construction: Factory prefabrication and on-site pile foundation work can proceed simultaneously, with the installation of a single panel taking only 20-30 minutes, significantly shortening the on-site work period.

    ✔High Strength: Designed compressive strength can reach C50-C60 levels, meeting the load requirements of Highway Class I or Highway Class II.

    Good Durability: Through optimized mix design and multiple waterproof treatments, it effectively resists chloride ion erosion and freeze-thaw cycles, with a designed service life of no less than 50 years.

    Reliable Connection: The surface is preset with shear grooves, shear keys, and overlapped waterproof layer structures, facilitating a reliable bond with the asphalt paving layer.

     

    e45fef6e08ab4d7dabe7da37a1743468


    3.Product Materials

    Main Concrete: C50/C60 high-strength concrete, with aggregate using continuously graded crushed stone and river sand

    Additives: Incorporating high-efficiency water reducer, air-entraining agent, and pore-opener, with water-cement ratio controlled below 0.35

    Prestress System: Low-relaxation steel strands (standard strength 1860 MPa) or HRB400 grade ordinary steel bars

    Mineral Admixtures: Fly ash and mineral powder to improve workability and durability

    Joint Filling Materials: High-elasticity epoxy mortar or polyurethane sealant

    Waterproof Layer Materials: Polymer-modified asphalt coating or cement-based crystalline penetration materials

     

    18be7fbdc5bd02c08e6416feba5cac21

    4.Design Features

    👉Structural Form: Uses bidirectional prestressing or bidirectional reinforcement

    👉Slab Thickness Range: 180mm-260mm

    👉Standard Width: 1.5m-2.5m

    👉Slab Connection: Shear keys (interlocking grooves) and transverse prestressing bars are provided to form an integral load-bearing deck

    👉Provisions for Auxiliary Facilities: Embedded anchor points, drainage slope (1.5%-2.0%), embedded bases for crash barriers, reserved slots for expansion joints

     

    0c5cd344e4ec6f7cd9596f7e35dfb8dd


    5.Core Advantages

    ⭐Extreme Environment Adaptability:Using low-temperature impact toughness materials (such as S460NL or ASTM A709 Grade 50T-2), it can maintain stable performance in extreme cold of -40°C or high-humidity marine environments, suitable for bridges in the Arctic Circle and offshore projects.

    ⭐Fatigue-Resistant Detail Innovation:Introducing U-rib internal welding technology or double-sided welding process, the fatigue grade of the U-rib-to-deck weld has been increased from FAT 90 to FAT 125, significantly extending the service life of bridge decks under heavy traffic.

    ⭐Pavement Layer Collaborative Optimization:The surface of the deck is treated with automatic shot blasting and coated with an epoxy anti-corrosion layer, combined with 3D laser scanning control for surface flatness (≤2mm/4m straightedge), ensuring the asphalt pavement layer does not develop reflective cracks.

    ⭐Intelligent Monitoring Integration:Embedded fiber Bragg grating strain sensors or wireless sensing nodes monitor deck strain and weld health status in real time, providing a data foundation for digital maintenance during operation.

    ⭐Full-Bolt Removable Design:High-strength bolt friction connections (no on-site welding) are used between panels, allowing individual panels to be independently removed and replaced, with replacement time not exceeding 4 hours per panel, significantly reducing traffic disruption during maintenance.

     

    f3c18ead0ae63903a3820386f9122bd9

    6.Global Standard

    Global Standard

    Specification Category

    Compliance Benefit

    BS EN 1991-2

    Bridge traffic load standard

    Meet European traffic load design requirements

    ASTM D6684

    FRP bridge deck material standard

    Certify composite panel durability

    JTG/T D64-01

    China steel-concrete bridge code

    Fit domestic highway standard construction

    ISO 14688

    Geotechnical & bridge deck material test

    Unified global material performance inspection

    NZTA Bridge Manual

    New Zealand road bridge code

    Adapt to oceanic high corrosion environment

     

     7.Why Choose Our Company

    Production Experience: Many years of experience in producing precast components for highway bridges. The production base is equipped with an automated concrete mixing station, intelligent steam curing kiln, and a prestressing tension control system.

    Precision Control: Size deviation of each panel is controlled within ±2mm.

    Certification: Certified with ISO 9001 quality management system and traffic product certifications.

    One-Stop Service: Provides full-process services from drawing development, mold design, production and transportation, to on-site installation guidance.

    Quick Response: Emergency projects can start production within 48 hours and complete the first batch of supply within 7 days.

    📧Satisfied after reading? Feel free to contact us, we look forward to working with you!🤝

     

    b5de4f7d3c73d9da755e3a2304a6e654