Leave Your Message
Products Categories
Featured Products
Kingspan Steel Bar Truss Girder Deck Composite Steel Flooring Formwork for Co...Kingspan Steel Bar Truss Girder Deck Composite Steel Flooring Formwork for Co...
01

Kingspan Steel Bar Truss Girder Deck Composite Steel Flooring Formwork for Co...

2019-04-30
 Kingspan Steel Bar Truss Girder Deck Composite Steel Flooring Formwork for Concrete Slab Mezzanine Construction   The steel flooring formwork is a new composite steel floor decking design and it is widely applied for the mezzanine construction of commercial and civilian buildings, such as factories, hospitals, gymnasiums, schools, bridge projects and residential buildings. The steel flooring formwork is composed of two parts, the steel bar truss deck melted onto the galvanized steel sheet.   The steel flooring formwork is made of galvanized steel sheet and steel bar truss.  The metal floor deck can bear the construction load and be directly put on girders. After the simple rebar-tying work, the workers can directly pour concrete into the truss deck. The application of the steel bar truss deck greatly reduces the workload of mould putting and tear down. In a word, it can help increase the work efficiency and advance the project period.   Specifications: Name Steel flooring formwork Base Material Hot Dipped Galvanized Steel Sheet Steel Grade SGCC  Yield strength   Q235 or Q345 Refer to Standards GB/T1591-2008  Thickness 0.8mm,1.0mm,1.2mm Zinc coating 60-275g/m2 Wave Height 51mm-76mm Effective Width 688mm-940mm Length 0-11.8m Less than 5.8m  load in 20GP  5.8m-11.8m load in 40GP Packing  Bundle ,water-proof package with steel belt  Delivery time 20 days after confirmation   Advantages: 1. Steel bars are evenly arranged and the bearing mode is reasonable, which greatly reduces the engineering quantity of temporary support. 2. The double edge fold design can effectively ensure the quality of the engineering. 3. It can shorten the time by reducing 60% to 70% work load of binding steel bars. 4. It has the same mechanical properties and fire resistance as that of traditional cast-in-place floors. Because the bottom mould does not join in the load-baring, it is unnecessary to consider fire proof and anti-corrosion.   Applications: 1. Applied to precast slabs, pr-high-speed railway sleeper. 2. Used in many high-rise, ultra- high-rise steel buildings 3. Used for steel building, mezzanine floor of “LOFT” 4. The force applied to the complex, special-shaped structure, building 5. Used in-situ concrete structure(RC) buildings 6. Used in the construction of slope roof structure   Details:     Production Process:   Packing & Shipping   Welcome to send your enquiry about more technical specifications together!    
view detail
Prefabricated High Strength Stable Steel Flooring Formwork for Commercial Bui...Prefabricated High Strength Stable Steel Flooring Formwork for Commercial Bui...
01

Prefabricated High Strength Stable Steel Flooring Formwork for Commercial Bui...

2019-05-15
Prefabricated High Strength Stable Steel Flooring Formwork for Commercial Building Construction   The steel flooring formwork is a new composite steel floor decking design and it is widely applied for the mezzanine construction of commercial and civilian buildings, such as factories, hospitals, gymnasiums, schools, bridge projects and residential buildings. The steel flooring formwork is composed of two parts, the steel bar truss deck melted onto the galvanized steel sheet.   The steel flooring formwork is made of galvanized steel sheet and steel bar truss.  The metal floor deck can bear the construction load and be directly put on girders. After the simple rebar-tying work, the workers can directly pour concrete into the truss deck. The application of the steel bar truss deck greatly reduces the workload of mould putting and tear down. In a word, it can help increase the work efficiency and advance the project period.   Specifications: Name Steel flooring formwork Base Material Hot Dipped Galvanized Steel Sheet Steel Grade SGCC Yield strength Q235 or Q345 Refer to Standards GB/T1591-2008 Thickness 0.8mm,1.0mm,1.2mm Zinc coating 60-275g/m2 Wave Height 51mm-76mm Effective Width 688mm-940mm Length 0-11.8m Less than 5.8m  load in 20GP 5.8m-11.8m load in 40GP Packing Bundle ,water-proof package with steel belt Delivery time 20 days after confirmation   Advantages: 1. Steel bars are evenly arranged and the bearing mode is reasonable, which greatly reduces the engineering quantity of temporary support. 2. The double edge fold design can effectively ensure the quality of the engineering. 3. It can shorten the time by reducing 60% to 70% work load of binding steel bars. 4. It has the same mechanical properties and fire resistance as that of traditional cast-in-place floors. Because the bottom mould does not join in the load-baring, it is unnecessary to consider fire proof and anti-corrosion. Applications: 1. Applied to precast slabs, pr-high-speed railway sleeper. 2. Used in many high-rise, ultra- high-rise steel buildings 3. Used for steel building, mezzanine floor of “LOFT” 4. The force applied to the complex, special-shaped structure, building 5. Used in-situ concrete structure(RC) buildings 6. Used in the construction of slope roof structure Details:   Production Process:   Packing & Shipping   Welcome to send your enquiry about more technical specifications together!
view detail
1.2mm Gauge Galvanized Steel Decking Formwork to Bottom of Concrete Slab1.2mm Gauge Galvanized Steel Decking Formwork to Bottom of Concrete Slab
01

1.2mm Gauge Galvanized Steel Decking Formwork to Bottom of Concrete Slab

2019-06-25
1.2mm Gauge Galvanized Steel Decking Formwork to Bottom of Concrete Slab The steel flooring formwork is a new composite steel floor decking design and it is widely applied for the mezzanine construction of commercial and civilian buildings, such as factories, hospitals, gymnasiums, schools, bridge projects and residential buildings. The steel flooring formwork is composed of two parts, the steel bar truss deck melted onto the galvanized steel sheet.   The steel flooring formwork is made of galvanized steel sheet and steel bar truss.  The metal floor deck can bear the construction load and be directly put on girders. After the simple rebar-tying work, the workers can directly pour concrete into the truss deck. The application of the steel bar truss deck greatly reduces the workload of mould putting and tear down. In a word, it can help increase the work efficiency and advance the project period.   Specifications: Name Steel flooring formwork Base Material Hot Dipped Galvanized Steel Sheet Steel Grade SGCC Yield strength Q235 or Q345 Refer to Standards GB/T1591-2008 Thickness 0.8mm,1.0mm,1.2mm Zinc coating 60-275g/m2 Wave Height 51mm-76mm Effective Width 688mm-940mm Length 0-11.8m Less than 5.8m  load in 20GP 5.8m-11.8m load in 40GP Packing Bundle ,water-proof package with steel belt Delivery time 20 days after confirmation   Advantages: 1. Steel bars are evenly arranged and the bearing mode is reasonable, which greatly reduces the engineering quantity of temporary support. 2. The double edge fold design can effectively ensure the quality of the engineering. 3. It can shorten the time by reducing 60% to 70% work load of binding steel bars. 4. It has the same mechanical properties and fire resistance as that of traditional cast-in-place floors. Because the bottom mould does not join in the load-baring, it is unnecessary to consider fire proof and anti-corrosion. Applications: 1. Applied to precast slabs, pr-high-speed railway sleeper. 2. Used in many high-rise, ultra- high-rise steel buildings 3. Used for steel building, mezzanine floor of “LOFT” 4. The force applied to the complex, special-shaped structure, building 5. Used in-situ concrete structure(RC) buildings 6. Used in the construction of slope roof structure Details:   Production Process:   Packing & Shipping   Welcome to send your enquiry about more technical specifications together!
view detail
Anti-Seismic Galvanized Corrugated Steel Floor Decking Permanent UpholdingAnti-Seismic Galvanized Corrugated Steel Floor Decking Permanent Upholding
01

Anti-Seismic Galvanized Corrugated Steel Floor Decking Permanent Upholding

2021-06-08
Anti-seismic Galvanized Corrugated Steel Floor Decking Permanent Upholding Slab Floor Decking Steel Sheet is roll formed by roll forming machine, mainly using galvanized steel, at thickness 0.8 - 1.2mm. Simple shape with high rib and high strength. Put the panel above the welded wire net, fill cement between them. This panel is usually used as the floor of high buildings, it can save steel mound and can also save the weight, in the same loading capacity, use this panel, and save the steel quantity, and thus save cost.   Floor decking steel sheet is roll formed by roll forming machine, mainly using galvanized steel, at thickness 0.8 - 1.2mm; Simple shape with high rib and high strength. Put the panel above the welded wire net, fill cement between them. This panel is usually used as the floor of high buildings, it can save steel mound and can also save the weight, in the same loading capacity, use this panel, and save the steel quantity, and thus save cost.   Features: 1. Floor decking steel sheet is roll formed by roll forming machine, mainly using galvanized steel, at thickness 0.8 - 1.2mm. 2. Simple shape with high rib and high strength. 3. Put the panel above the welded wire net, fill cement between them.   Galvanized composite metal floor decking Our Roof Decking range offers a variety of metal thickness (0.50 mm to 1.5mm) profile and finish to meet different requirements regarding span , insulation, water proofing, imposed load, thermal efficiency and any other considerations. 1. It can be used as a permanent structural support member for slab. 2. It will enable fast construction of building roofs and floors save up to 50% of construction time of the slab and roof. Once design as composite structural, will allow either to reduce or to eliminate the structural steel used in RCC slabs. 3. It combines exceptional spanning capabilities with reduced concrete usage to provide a cost-effective and attractive floor solution that's easy to install .   Specification and details of galvanized composite metal floor deck floor Decking Thickness 0.8-1.2mm; max 1.5mm Length 0mm-11800mm Width 600mm-1025mm (depend on the model you chose) Thickness Tolerance: +/-0.04mm Width Tolerance: +/-5mm Zinc Coating: 60-275g/m2; Certification ISO9001 Packing Seaworthy packing   Characteristics   1. There are processed slots between the corrugations of the profiled steel plates, available for engineering use like electric power and communications. 2. The dead load of the entire structure is reduced, saving the basic cost of the lower part. 3. During construction, the profiled steel plate can enhance the lateral stability of the supporting steel beam. 4. It gives full play to the mechanical properties of two materials - steel and concrete. 5. It does not require form work, getting rid of the removal and installation of form-works. 6. The profiled steel plate is equal to tensile main rib based on calculation, only moisture reinforcements are needed. 7. The profiled steel plates provide an even ceiling surface for concrete buildings. 8. After installation, the profiled steel plate can be used as a safety work platform for workers, tools, materials andequipment. 9. Low Cost.   Advantages:   Greater Durability The FAMOUS steel base product has a Z350 zinc-coating mass. It was selected to provide superior corrosion protection in service, directly as a result of increased coating mass. FAMOUS steel is also available with a Z450 coating mass with a 15 year warranty. Comprehensive shear stud welding tests across a range of base thickness with both coating masses were undertaken to ensure consistent results can be achieved on site.   Unbeatable Strength Steel and concrete composite slabs are lighter and stronger than most conventional slabs. The steel decking provides tensile reinforcement, combining with the compressive strength of the concrete for an all round stronger slab. Steel decking profiles are designed to prevent any longitudinal slip between the steel and concrete in the slab itself, and any transverse movement between the slab and supporting beams.   Greater Savings The weight savings achieved in composite slabs can be passed on to other areas of the design, such as foundations. And because steel decking acts as permanent formwork, it can significantly reduce the need for propping or temporary formwork -saving both time and money. Easy On-Site Handling Steel decking is delivered to site in pre-cut lengths, and in pre-packaged bundles. The bundles can be easily craned into work areas, and the individual sheets quickly layed by hand. One truck can carry 1,000 sq metres of decking at a time, and a team can install up to 400 sq metres in a day.   Speedy, Safe Construction A composite slab effectively acts as a safe working platform. Once the slab is poured, following trades can get on with their jobs below almost immediately. At the same time, work can continue unhindered on the floors above, allowing simple installation of services. Cable trays, ductwork and service pipes can be suspended neatly underneath the slab with purpose designed clips, brackets and hangers that locate easily and quickly into recesses in the steel decking profile.   Application: Power plant, power equipment company, car showroom, steel structure plant, cement warehouse airport terminal, railway station, stadium, concert hall, theater, supermarket, logistics center, exhibition hall, etc. Meanwhile we can also different models of decking series. Please check bellow pictures. If you prefer any of them, please contact with me directly.
view detail
Structural Steel Bar Truss Girder Metal Composite Deck For Concrete FloorStructural Steel Bar Truss Girder Metal Composite Deck For Concrete Floor
01

Structural Steel Bar Truss Girder Metal Composite Deck For Concrete Floor

2021-06-08
Multi Storey Building Materials Structural Steel Bar Truss Grider Slab Metal Composite Deck For Concrete Floor Steel bar truss girder is composite of corrugated sheet and steel bar truss which replace wooden template to bear all the construction loads in the construction phase and participate in bearing structure load in the service stage. Composite deck is floor deck which replace all or part of the force steel bar and work together with concrete in the service stage, while steel sheet of steel truss deck does not participate in bearing structure load, it's non-composite deck. The steel bar truss deck is a new metal deck design and it is widely applied for the mezzanine construction of commercial and civilian buildings, such as factories, hospitals, gymnasiums, schools, bridge projects and residential buildings. The steel bar truss deck is composed of two parts, the steel bar truss and the galvanized steel sheet.   Specifications: Width 576mm /600mm according to project needs/design Overlap Width 566mm /590mm etc Maximum length 11.8m or custom requirement Height 70-270mm etc Top and bottom bar diameter 6-12mm etc Cross bar diameter 4-8mm etc Decking thickness Galvanized steel sheet 0.5mm etc   ADVANTAGES 1. Steel bars are evenly arranged and the bearing mode is reasonable, which greatly reduces the engineering quantity of temporary support. 2. The double edgefold design can effectively ensure the quality of the engineering. 3. It can shorten the time by reducing 60% to 70% work load of binding steel bars. 4. It has the same mechanical properties and fire resistance as that of traditional cast-in-place floors. Because the bottom mould does not join in the load-baring, it is unnecessary to consider fire proof and anticorrosion.   While FASEC Rebar-truss triangle welded metal decking system adapts rapid construction requirements of the main steel structure and provide fast work procedures. It can save a lot of construction time compared to traditional floor decking system. It can also improve the rigidity of the floor and save the amount of steel and concrete, so as to reduce the project budget.   The Surface embossed increase the bonding of floor deck and concrete, make the floor deck system has high-strength bearing capacity. It is totally fire-proof and can span long without middle propping.   So from cost saving and time saving view, the FASEC rebar-truss triangle welded metal decking system is better choice. However, in much of ready design, the deck is already designed and in avoiding of redesign, recalculation and re-submit/approval, we can also offer various customized steel floor deck profiles to cater for various contractors’ need, meanwhile we will offer various technical support in the aspects of load span and stress analysis etc.   Following are some typical detail:   Warmly welcome various clients from International market to enquiry and visit us!
view detail
Reinforced Concrete Bearing Steel Floor Deck Galvanized Corrugated Metal Prof...Reinforced Concrete Bearing Steel Floor Deck Galvanized Corrugated Metal Prof...
01

Reinforced Concrete Bearing Steel Floor Deck Galvanized Corrugated Metal Prof...

2021-06-09
Steel Bar Reinforced Concrete Bearing Plate Galvanized Corrugated Metal Profiled Steel Truss Floor Deck The steel bar truss deck is made of sheet and steel bar truss. The deck can bear the construction load and be directly put on girders. After the simple rebar-tying work, the workers can directly pour concrete into the truss deck. The application of the steel bar truss deck greatly reduces the workload of mould putting and teardown. In a word, it can help increase the work efficiency and advance the project period.   Steel deck is a cold formed corrugated steel sheet supported by steel joists or beams. It is used to support concrete or insulating membrane of a roof. It was developed to provide a structurally efficient product for use in roof and floor systems.Its design and fabrication maximizes the properties of the steel in order to create a high strength-to-weight ratio, which lowers the material, handling, and erection costs but maintains the durability that has been proven by over 50 years of satisfactory performance.Despite the fact that it is a structural component, its uniform quality can offer an attractive appearance, especially with the use of properly specified shop and field applied coatings.   Specifications: Name steel truss deck Base material Hot Dipped Galvanized Steel Sheet Steel Grade SGCC Yield strength Q235 or Q345 Refer to Standards GB/T1591-2008 Thicknes 0.8 -1.5mm(normal 0.8,1.0,1.2) customized Zinc coating 45-275g/m2,customized Wave Height 45mm-75mm, customized EffectiveWidth 650mm-1000mm, etc   Length 0-11.8m fit into container loading Less than 5.8m load in 20GP 5.8m-11.8m load in 40GP Packing Bundle ,water-proof package with steel belt Delivery time 20 days after confirmation     ADVANTAGES 1.Adapt rapid construction requirements of the main steel structure, provide fast work procedures. 2.Improve the rigidity of the floor, saving the amount of steel and concrete. 3.Surface embossed increase the bonding of floor deck and concrete, make the floor deck system has high-strength bearing capacity. 4:Our floor deck has passed the fire resistance text of the national fixed fire extinguishing system and fire-resistance component quality inspection center. As a combination of floor deck, no need the fireproof coating, so greatly reduce the project cost. It is widely applied for the mezzanine construction of commercial and civilian buildings, such as factories, hospitals, gymnasiums, schools, bridge projects and residential buildings.   While FASEC Rebar-truss triangle welded metal decking system adapts rapid construction requirements of the main steel structure and provide fast work procedures. It can save a lot of construction time compared to traditional floor decking system. It can also improve the rigidity of the floor and save the amount of steel and concrete, so as to reduce the project budget.   The Surface embossed increase the bonding of floor deck and concrete, make the floor deck system has high-strength bearing capacity. It is totally fire-proof and can span long without middle propping.   So from cost saving and time saving view, the FASEC rebar-truss triangle welded metal decking system is better choice. However, in much of ready design, the deck is already designed and in avoiding of redesign, recalculation and re-submit/approval, we can also offer various customized steel floor deck profiles to cater for various contractors’ need, meanwhile we will offer various technical support in the aspects of load span and stress analysis etc.   Following are some typical detail:   Warmly welcome various clients from International market to enquiry and visit us!
view detail